The District hired CPM as its program manager to assist with the planning and implementation of their $66.8 million facility program for new construction and renovation. Initial services included revisiting and refining the master plan, providing strategic planning, conducting condition assessments, establishing project priorities, analyzing cash flow, developing a program schedule, determining project budgets and compiling this plan. CPM also developed the District facility standards and outline specifications, procured design services, and has been providing design phase management through bid and award. During construction phase the scope includes monitoring and tracking of program cash flow, program and project budgets and assisting with the governmental agencies project closeout.

Capital Program Management Program Team
* Mike Wassermann
Principal-In-Charge
mike@capitalpm.com
* Paul Chambers
Program Manager
paulc@capitalpm.com
* Heather Dutton
Assistant Project Manager
heatherd@capitalpm.com
* Terra Johnson
Program Coordinator
terra@capitalpm.com
* Catherine McBride-Stern
Budget Analyst
catherinem@capitalpm.com

Implementation Plan
The Implementation Plan describes the overall scope, schedule and budget for the master-planned improvement projects along with the renovation projects. Included in the Implementation Plan are the history of the program, supporting data, and the methodology used to develop this plan. The Implementation Plan serves as a detailed blueprint to guide the execution and successful completion of the Program.

Implementation Plan - Measure B Facility Program

Initial Study
The District consulted with Environmental Science Associates (ESA) to assess the environmental impacts of the master planned projects. ESA conducted an Initial Study to determine the significance of the environmental impacts of the facility improvement program. The Initial Study concluded that although there were potential environmental impacts, the District could take measures to mitigate them to less than a significant level. In the October 2005 Board meeting, action was taken to implement the Mitigated Negative Declaration process and to provide additional public notification, a public hearing and an increased public review period to ensure that the community had ample opportunity to comment. Click on the link below to for the full-text Initial Study document in pdf format.

Initial Study

Design Standards
The goal of the Hillsborough City School District Design standards is to provide the various design professionals working on each of the different projects with direction that will produce a uniform and consistent product. The items included in design standards are selected based upon life cycle cost, durability, ease of maintenance and value. These standards include procedural requirements and desired products for items that may be included in the educational specifications or specific scope statement.

Hillsborough Facility Design Standards


Budgets and Expenditure Tracking
The purpose of the Master Program Budget is to give an overview of how the facilities program is performing. The Master Program Budget lists every individual project budget by line and also details the funding of the entire program by year. And is used to track expenditures.

The Project budgets were compiled using input from various consultants and industry standards for costs. Budgets are developed for each campus and then further divided into individual projects for each campus. The first page of each project budget presents a summary of the costs for the project as well as the funding for the project. Behind the summary are the details for each project beginning with the funding detail and moving to the costs by line item.

Budgets and Expenditures

Project Plans & Drawings
The following link is to the District’s web portal at BarkerBlue in where all of the available Measure B plans and drawings are available for viewing, printing and ordering copies.

Archive Plans & Drawings

*Crocker 2008 Technology, Lecture Hall and Band Room Project
     Schematic Design Report
     Schematic Design Drawings

*North Multi-Purpose Room Project
     Schematic Design Report
     Schematic Design Drawings

*South Multi-Purpose Room Project
     New Multi-Purpose Room Building Cost Estimate
     Schematic Design Report

*West New Classroom Project
     New Classroom Building Cost Estimate
     Schematic Design Report

Links